Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) INSTALL ALL PLUMBING FIXTURES 2) MAINTAIN 1" CLEARANCE FLUE PIPE TO COMBUSTIBLES 3) H20 HEATER INSTALL NOT TO CODE |
|
| 06/28/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) POST ADDRESS NUMBERS HOUSE FRONT 2) INSTALL APPROVED LANDING EXTERIOR DOORS AND HANDRAIL STAIRS 3) INSTALL ANTI-SIPHON HOSE BIBS, MUST MAINTAIN MINIMUM 6'-8" HEAD ROOM CLEARANCE STAIR WELLS; INSTALL HAND RAIL STAIRS 4) NEED APPROVAL USING ATLERNATE H20 HEATER PTR LINE GOING UP AND OUT INSIDE OF DOWNWARD; NEED COMBUSTION/RELIEF H20 HEATER; INSTALL ALL PLUMBING FIXTURES 5) BASEMENT ROOMS SHOWN AS BEDROOMS-WINDOWS DO NOT MEET MINIMUM EGRESS REQUIREMENTS; MUST HAVE ELECTRIC POWER ON FOR FINAL; PLAN DOES NOT REFLECT DELETION OF BASEMENT FURNACE. STOPPED INSPECTION-MUST COMPLETE ALL AND RECALL. NO REINSPECTION FEE ASSESSED AT THIS TIME |
|
| 04/11/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |