Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
Permit Number - T06CM00847
Inspection Description - PLUMBING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CORRECTIONS AT UNIT #10 ONLY GAS AT STOVE OK DRAIN AT SHOWER REPAIRED. 2. WATER HEATER VENT AT LAUNDRY ROOM CORRECTED OK 3. THIS PERMIT WILL BE FINALED WHEN OTHER CORRECTIONS ARE MADE. |
|
05/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - THIS IS A COMMERCIAL PROPERTY. - ALL COMMERCIAL WORK REQUIRES APPROVED PLANS. - IF GAS IS INCLUDED, PROVIDE DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION IN SYSTEM. - ALL VALVES TO BE AGA OR CSA APPROVED. - HOSE BIBBS REQUIRE ATMOSPHERIC VACUUM BREAKERS. - ABS VENTS TO BE PAINTED. - ABS IS NOT APPROVED IN EXPOSED EXTERIOR LOCATIONS. - ALL FIXTURES REQUIRE VENTS - WATER HEATERS REQUIRE PROTECTION (ENCLOSURE). - SYSTEMS REQUIRE 10 POUND TEST I STILL HAVEN'T SEEN VIOLATION |
|
05/10/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. THERE ARE MORE THAN A DOZEN UNITS AT THIS ADDRESS UNKNOWN IS THE NATURE OF THE COMPLAINT JOHN DIDN'T ANSWER WHEN I CALLED - NO VOICEMAIL DID NOT LOCATE GAS PRESSURE TEST, BUT DID OBSERVE SEVERAL CODE VIOLATIONS. PLEASE PROVIDE NAME AND LICENSE NUMBER FOR PLUMBER, AND HAVE HIM ON SITE AT THE NEXT INSPECTION; ALSO A COPY OF THE VIOLATION. UNABLE TO MAKE INSPECTION. |