Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/20/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED GAS TEST 2) SUPPORT ABS IN POWDER |
|
| 07/18/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
| 07/14/2006 | FRAMING | Partial Approval | IVRS - Inspection :* 1) CHECK ANCHOR BOLTS FOR 4' SPACING THRU-OUT 2) BRACE 4 GANG BOX TOP OF STAIRS 3) REPAIR WIRE BEDROOM 3 4) SUPPORT ABS EVERY 4' 5) SUPPLY OK 6) NO DWV WATER TEST 7) NO PRESS 8) NEED 1" CLEARANCE TO H20 B-VENT |