Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T06CM00702
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/13/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
04/12/2006 | PLUMBING - FINAL | Partial Approval | 1) BACKCLOW DEVICES ARE INSTALLED, BUT SODA VENDOR AND ICE TEA VENDOR HAVE NOT MADE THEIR FINAL CONNECTIONS 2) CORRECT CONDENSATE DRAIN ON ICE MAKER. HAS BACK PITCH AND BLOCKING FLOW DEVICE 3) LAV REQUIRES CHALKING AND STRAINER. WC REQUIRES BOWL CAPS |
|
04/07/2006 | PLUMBING - FINAL | Denied | NEW FIXTURES IN EXISTING RESTROOMS SHALL BE CAULKED AT WALL. TOILET SEATS REQUIRED TO BE OPEN FRONT SEATS. BEVERAGE DISPENSER HAS CARBONATED BEVERAGES, NON CARBONATED BEVERAGES, WATER AND ICE. EACH TYPE OF BEVERAGE REQUIRES BACKFLOW PROTECTION THAT IS SEPARATE FROM EACH OTHER. ICE MACHINE ALSO REQUIRES BACKFLOW PROTECTION. PRESSURE RELIEF REQUIRES A DRAIN. DRAIN PAN HOSES SHALL BE CLAMPED TO PREVENT LEAKAGE, AND SECURED. |
|
03/29/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL ALL BEVERAGE EQUIPMENT BEFORE FINAL INSPECTION. RECERTIFY RP ASSEMBLY CERTIFIED ON 3.16 BECAUSE OF WORK DONE UPSTREAM OF ASSEMBLY. |
|
03/21/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COFFEE BROWNING EQUIPMENT NOT SHOWN ON PLAN ALSO REQUIRES BACKFLOW PROTECTION. BACKFLOW PROTECTION FOR COFFEE MACHINE MUST BE SEPARATE FROM SODA FOUNTAIN. INSTALL BACKFLOW PREVENTER UPSTREAM OF RP FOR SODA FOUNTAIN. CERTIFY, AND RECERTIFY RP FOR SODA, AFTER COMPLETING UPSTREAM MODIFICATIONS. PROVIDE CLEANOUT FOR HAND SINK |