Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/09/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* EACH CARBONATOR REQUIRES SEPARATE BACKFLOW PROTECTION WITH CERTIFICATION. WASH & RINSE TO BE SEPARATE FROM SANITIZE BOWLS OF 3-COMPARTMENT SINKS. PROVIDE DRAINAGE FITTINGS ON INDIRECT DRAINS WITH P-TRAPS ON INDIRECT DRAINS OVER 5' IN LENGTH. PROVIDE LONG RADIUS FITTING FOR AIR ADMITTANCE VALVE AT BAR HAND SINK. FINISH INSULATION IN WATER HEATER AREA NON-CARBONATED BEVERAGE DISPENSER REQUIRES DOUBLE CHECK TESTABLE BACKFLOW DEVICE. |