Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROOF DRAINS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2006 | PLUMBING - ROOF DRAINS | Approved | ||
| 04/07/2006 | PLUMBING - ROOF DRAINS | Not ready for Inspection | 1. PROVIDE APPROVED TRANSITION COUPLING FOR CAST IRON TO PLASTIC. 2. PIPING IN COLUMNS IS DIRECTLY EMBEDDED IN CONCRETE. NO PIPING SHALL BE DIRECTLY EMBEDDED IN CONCRETE AND COVERED WITHOUT INSPECTION. 3. SUPPORT HORIZONTAL PIPING RUNS. |