Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* RECEIVED AUTHORIZATION TO DISCHARGE ON SITE CONTRACTOR SHALL INSTALL FRANK PATTERN IRON BODY CLEANOUT IN FLOOR FOR IN LINE CLEANOUT |
|
| 03/02/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* SEE NOTE #4 FROM 3/1/07 INSPECTION AND COMPLY WITH THIS INSTALLATION STANDARD PRIOR TO GETTING INSPECTION. FAILURE TO COMPLY WITH NOTES LEFT ON INSPECTIN WILL RESULT IN REFEE. |
|
| 03/01/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE ADDRESS ON SITE. 2. SHALL INSTALL PER APPROVED PLAN 3. NO DISCHARGE IS ALLOWED ON BUILDING DRAIN INTO SITE SEWER WITHOUT AUTHORIZATION TO DISCHARGE FOR SEWER DISCONNECT HCS AND DO NOT ALLOW FLOW TO DOWNSTREAM WITHOUT AUTHORIZATION TO DISCHARGE. 4. PROVIDE GOOD BEDDING & SHADING MATERIAL FOR PIPING WITH PIPING EXPOSED & FITTINGS EXPOSED ON TOP. |