Inspection History Details
Permit: T06CM00518
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1. RUMOR HAS IT THAT THE COUNTER TOPS ARE GOING TO BE CHANGED. CONTRACTOR TO INSURE THAT SINK AND LAVS ARE RE-CLIPPED AND RE-CAULKED IN THE SAME FASHION AS THEY ARE NOW. 2. PLUMBING FINAL OK |
|
| 06/05/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. 2 CLIPS ON LAVATORY INSUFFICIENT 2. KITCHEN SINK WILL REQUIRE AT LEAST 2 CLIPS ON EACH SIDE, AND AT LEAST THREE ALONG THE FRONT AND THE BACK. 3. BRANCH TAILPIECE AT LAVATORY RESTRICTS FLOW FROM 3/4" TO 1/2" ON CONDENSATE. NOT APPROVED. |
|
| 06/01/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SINK AND LAVATORIES REQUIRE CLIPS AND CAULK. 2. D.W. DRAIN HOSE TO BE SECURED WITHIN 2" OF DRAIN BOARD HEIGHT WITH APPROVED STRAP. |
|
| 05/30/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |