Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/04/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - I WANTED TO SEE A WATER TEST ON TUB AND DWV' - 315.4 ALL EXCAVATIONS SHALL BE BACKFILLED AS SOON AS POSSIBLE AFTER INSPECTION AS PRACTICAL. - TRENCHES SHALL BE BACKFILLED TO 12" ABOVE PIPING WITH CLEAN EARTH BEFORE MECHANICAL DEVICES ARE USED. - GET THE ROCKS OFF THE PIPE. - I MAY REOPEN YARD WATER INSPECTION IF THE ABOVE REQUESTS ARE NOT ADHERED TO. |
|
| 05/02/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SECURE ICEMAKER VALVE AND SUPPLY LINE. REMOVE EXCESS FLUE FROM SOLDIER JOINTS W/A DAMP RAG SEE UPC INSTALLATION STANDARDS. SECURE TUBING BEHIND SHOWER. CORRECT LEAK ON TUB DRAIN. OK TO COVER ALL AREAS - RECALL FOR INSPECTION AFTER CORRECTING ITEMS. |
|
| 04/28/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* HORIZONTAL TO HORIZONTAL CHANGE OF DIRECTION ON DWV REQUIRE WYE PATTERN FITTINGS. OVERHEAD HORIZONTAL ABS REQUIRES SUPPORT AT CHANGE OF DIRECTION. CLOSET FLANGES SHALL BE SECURELY FASTENED TO FLOOR. WATER TEST REQUIRED ON TUB WASTE & OVERFLOW AND SHOWERS. PROVIDE 18" OF METALLIC PIPING FROM POINT OF SOLDIER CONNECTION TO PER TUBING. WATER HEATERS INSTALLED ON A SUB-FLOOR IN WHICH DAMAGE COULD OCCUR REQUIRES A WH PAN AND A DRAIN. PROVIDE A GAS PRESSURE WITH 1/10 PSI INCREMENTATIONS IN ORDER TO ASSURE LINE TIGHTNESS WITHIN A REASONABLE PERIOD OF TIME. INSTALL HB VAC BREAKERS. |