Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/19/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 04/18/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* GAUGE PRESSURE 3.5 CORRECTIONS NOT MADE PROTECT COPPER FROM METAL LATHE |
|
| 04/14/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* LEAK ON PRV SECURE GAS PIPING AT STOVE 18" OF COPPER REQUIRED FROM SOLDED VALVES, HB, FLEX CONNECTIONS TO CONNECTION TO PEX TUBING. SECURE CLOSET STUB OUTS, PIPING AT SHOWER VALVES. |