Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/22/2007 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 11/16/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BUILD PER PLAN OR HAVE PLAN REVISED |
|
| 11/14/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REVISE DRAWINGS TO REFLECT AS BUILT 2) NAIL WHERE INDICATED |
|
| 11/08/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SAME AS BEFORE HAVE CONTRACTOR OR OWNER MEET INSPECTOR ON NEXT INSPECTION |
|
| 11/03/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE CITY APPROVED TRUSS DRAWINGS 2) INSTALL SKY LIGHTS PER PLAN 3) PROVIDE BRACING PER DETAIL 208 4) INSTALL CORBELED BEAMS & VIGAS PER PLAN 5) INSTALL A35'S AT PER PLAN TOP PLATES 6) INSTALL A35'S SHEAR TRANSFER PER PLAN 7) PROVIDE GABLE END BRACING PER PLAN 8) DBL 2 X 8 HDR'S REQUIRED AT HDR PER PLAN 9) STRAP INSIDE OF HDR AT BREAK IN DBL TOP PLATE 10) STOPPED INSPECTION-PLEASE BUILD PER PLAN |
|
| 11/01/2006 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* WORK SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTIONS PURPOSES UNTIL APPROVED. SEC 109.1 IBC |