Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM00306
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2006 | ENGINEERING - FINAL | Approved | SITE IS ALREADY OCCUPIED AND OPEN FOR BUSINESS DRIVEWAY HAS BEEN INSTALLED DUMPSTER AND DEBRIS HAVE BEEN REMOVED |
|
04/05/2006 | ENGINEERING - FINAL | Not ready for Inspection | 1. ROLL OFF DUMPSTER NEEDS TO BE REMOVED 2. DRIVE WAY NEEDS TO BE INSTALLED PER PLAN 3. TRASH AT OLD ROLL OFF LOCATION MUST BE CLEANED UP COMPLETELY (LABORER DOING CLEAN UP WHEN I WAS ON SITE) CALL 2-4 DAYS BEFORE C OF O NEEDED TI IS COMPLETE ENOUGH FOR STOCKING ONLY-NO PUBLIC ACCESS |
|
03/30/2006 | ENGINEERING - FINAL | Not ready for Inspection | 1. ROLL OFF DUMPSTER NEEDS TO BE REMOVED 2. DRIVE WAY NEEDS TO BE INSTALLED PER PLAN 3. INSTALL ALL DOORS AND ADJACENT CONCRETE SLABS (REMOVE FORMS) CALL 2-4 DAYS BEFORE C OF O NEEDED TI IS COMPLETE ENOUGH FOR STOCKING ONLY-NO PUBLIC ACCESS |
|
03/01/2006 | ENGINEERING - FINAL | Not ready for Inspection | RECALL 2-4 DAYS BEFORE C OF O |