Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2008 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 06/11/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE OVERFLOW SENSORS ON SECONDARY DRAINS 2. I.D DATA PLATES ON FAN COILS 3. I.D EQUIPMENT WITH UNIT NUMBER PERMANENTLY 4. PLANS REQUIRE COPPER CONDENSATE DRAINS 5. CONDENSORS NOT FUSED CORRECTLY 6. FAN COILS NOT FUSED CORRECTLY 7. PLANS REQUIRE INSULATION ON CONDENSATE DRAINS 8. AC FANS TO RUN CONTINUOUSLY WHILE THE BLDG IS OCCUPIED 9. AIR BALANCE OK 10. DUCT SMOKE DETECTORS OK |