| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2009 | FRAMING | Approved | IVRS - Inspection :* 1) FOR THE BATHROOM |
|
| 05/07/2009 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE ELECTRICAL INTERMEDIATE |
|
| 04/13/2009 | FRAMING | Partial Approval | CHANGED TO PARTIAL PENDING REVISION | |
| 04/06/2009 | FRAMING | Partial Approval | IVRS - Inspection :* 1) COMPLETE MECHANICAL 2) OK TO INSULATE EXCEPT MECHANICAL GROUND RODS USED 3) OUTSIDE GFI TO BE REMOVED FROM BATH CIRCUIT 4) CHANGE CLOSET LIGHT LOCATION 5) CONNECT GROUND RODS WITH #4 COPPER 6) DISCONNECT WIRES FROM BREAKERS WHERE ELECTRIC NOT COMPLETE 7) BOND WATER AT ACCESSIBLE LOCATION |
|
| 02/09/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* 1) NEED TO TREAT POST AT EXT. 2) FINISH H2.5 AT RAFTERS TO TOP PLATES |
|
| 01/26/2009 | FRAMING | Not ready for Inspection | IVRS - Inspection :* |