Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/09/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/05/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE #1 FROM 6/28/07 ON ALL FLOOR SINKS (ALL INDIRECT DRAINS TO HAVE MINIMUM 1" AIR GAP AT TERMINATION) |
|
| 06/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. ALL INDIRECT DRAINS TO HAVE MINIMUM 1" AIR GAP AT TERMINATION 2. DRAIN FROM ESPRESSO MACHINE SHALL BE GRAVITY AND BE RIGID CONNECTION TO PVC DRAIN 3. PVC SHALL BE PRIMED & THEN GLUED 4. PROVIDE LISTING FOR WATTS POLYETHENE TUBING USED AS WATER SUPPLIES. 5. LABEL EACH BACKFLOW DEVICE FOR ITS USE 6. COMPLETE SODA DISPENSER WATER SUPPLIES |
|
| 06/21/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |