Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 08/02/2006 | FRAMING | Partial Approval | IVRS - Inspection :* - GET ENGINEERED REPAIR FOR FLOOR JOIST L/R - OKAY TO INSULATE AND DRYWALL AREAS OTHER THAN FLOOR JOIST. |
|
| 07/25/2006 | FRAMING | Cancelled | CANCELLED PER SUPER | |
| 06/06/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) OUTSIDE HOSE BIB REQUIRES ANTI-SIPHON VALVE 2) NO DWV WATER TEST 3) PLUMBING AND ELECTRIC OUT OF WALL POWER ROOM 4) NAIL PROTECT PLUMBING 5) COMPLETE WIRING HALL BATH 6) PROVIDE DRY WALL NAILER HALL BATH WINDOW 7) MECHANICAL MAKE UP AIR MUST BE 10 FEET FROM SEWER VENT 8) TRUSS WEB DAMAGED BY PLUMBING. LIVING ROOM NORTH EAST CORNER/WALL. PROVIDE ENGINEERS APPROVED REPAIR WITH CITY STAMP 9) HIP TRUSS NOT NAILED TO HANGER OVER ENTRY 10) NAIL SHEAR CHANNELS PER 5/DT1 11) INSULATE RETURN AIR PLENIUM R-5 12) STOPPED INSPECTION-TOO MANY ITEMS |