Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/09/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 05/08/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" CLEARANCE TO COMBUSTIBLES AROUND B-VENT 2) FIRE STOP 2ND FLOOR PENETRATIONS 3) COMPLETE LATHE AND SEAL VAPOR BARRIER. SECURE BOTH SIDES OF 4 GANG SWITCH BOX 4) LEAK AT MASTER BATH 5) REPLACE STUD HALL BATH 2ND FLOOR |