Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU02967
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2008 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 05/27/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 05/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) INSTALL TEMP SEDIEMNT CONTROLS ALONG NW CORNER OF SITE 2) PROTECT EXISTING CATCH BASIN ALONG WEST PERIMETER UNTIL SITE IS STABILIZED |
|
| 04/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) SEDIMENT CONTROLS CAN BE REMOVED IN PLACES WHERE PERIMETER WALL HAS BEEN CONSTRUCTED. 2) SWEEP UP EXCESS ROCK AND SOIL OFF OF PUBLIC ROADWAY ALONG SOUTH SIDE OF SITE. 3) CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS UNTIL THE SITE IS 100% PAVED. 4) PROVIDE THE MOST CURRENT APPROVED PLANS FOR FINAL INSPECTIONS. 5) COMPLETE ALL SITE WORK PRIOR TO APPROVAL FROM ENG. FOR A C OF O. |
|
| 03/11/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP UP SILT FROM EAST SIDE OF SITE. DIRT/TRACKING ON PARKING LOT. NO OTHER STORM WATER CONCERNS AT THIS TIME |