Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T06BU02967
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2008 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 02/20/2008 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) ADD SEDIMENT CONTROLS ALONG NE CORNER OF SITE, FROM 1/2 WAY POINT TO THE NORTH END - WATER/SILT DISCHARGING FROM THAT POINT. 2) ADD A SIGN TO YOUR CONCRETE/MATERIALS WASH OUT. CORRECT BY 10 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
| 02/05/2008 | STORMWATER INSTALL OF CONTROLS | Correction Required | RAINING TODAY, STORM WATER CONTROLS INSTALLED. 1) INSTALL WADDLE ALONG NE CORNER OF SITE - SITE DISCHARGING STORM WATER AT THAT POINT. 2) RE-ESTABLISH ROCK ENTRANCE/EXIT. 3) REMOVE DIRT RAMP FROM CURB LINE AT SE CORNER OF SITE. 4) CONTINUE TO SWEEP TRACKING OF SOIL OFF PUBLIC ROADWAYS. |
|
| 01/24/2008 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | BMP'S WERE BEING INSTALLED, HOWEVER INSTALLATION WAS NOT COMPLETE. WILL RE-INSPECT |