Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2008 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ADD ONE SECTION OF WADDLE TO EXISTING PERIMETER CONTROLS AT THE WEST ENTRANCE - TIE INTO STABILIZED ENTRANCE. 2) INSTALL A CONCRETE/METRIALS WASH OUT ON SITE PER YOUR SWPPP 3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP. 4) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS ROUTINELY. 5) POST A COPY OF YOUR NOI ON SITE. |