Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | SPOKE WITH SUPERINTENDENT - JERRY FORM GILES CONSTRUCTION, DISCUSSED SWPPP. 1) INSTALL WADDLE ALONG SOUTH AND WEST PERIMETER. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT ON SITE. 3) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE. 4) SWEEP UP TRACKING OFF OF PUBLIC ROADWAYS ROUTINELY. 5) MAY NEED TO INSTALL SUPPLEMENTAL BMP'S AROUND EXISTING STORM SEWER CATCH BASINS IN CURBLINE. 6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 7) MAKE A COPY OF YOUR SWPPP AND GRADING PLAN AVAILABLE ON SITE. |
|
| 11/02/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY | |
| 09/20/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | ||
| 06/06/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | ||
| 05/15/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY | |
| 04/26/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY ON SITE |