Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU02936
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilzed. | |
05/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to remove dirt ramp from street. Left message for Danny site super. | |
04/01/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor still needs to sweep street and clean up wash out. | |
03/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to: 1- Clean all wash out around site. 2- Remove material from detention basin. 3- Install construction entrance. 4- Sweep Wieding Rd. Spoke to Danny site super in regards to. If items not addressed I will issue stop work order. |
|
11/15/2007 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | Spoke to site super in regards to grades around site. Look low. Asked super to call for inspection once Magnum has installed A-B. Also contractor needs to start addressing SWPPP items in a timely manner. | |
11/01/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Need to clean up wash out. | |
10/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean up wash around site. 2- Stake down wattle southwest corner. 3- Repair construction entrance. |
|
09/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Danny on site. Went over re-fee, material dumped on site, the need to stabilize all areas disturbed by construction outside grading limits. | |
09/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to stake down wattle in west entrance to Valencia Rd. Clean up material dumped on site. | |
09/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Notice of Violation. Contractor has 2 days to address: 1- Clean up all wash out on site. 2- Provide washout area per approved SWPPP plan. 3- Install controls in west entrance a long Valencia Rd. Spoke to site super Danny, via cell phone at 1255 pm. Went over issues on the phone. If items are not address I will Stop Work Order. |
|
08/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install construction entrance on southeast corner. (New entrance onto Valencia.) | |
07/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to control track out. | |
07/20/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Repair construction entrance. 2- Reinstall wattle on northside of project. Spoke to site super in regards to. I explained to Matt with magnum once the basin is able to receive flows from storms the basin will need to be protected. |