Permit: T06BU02936

Parcel: 140280310


Addresses:

2111 E VALENCIA RD

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
10/17/2008 STORMWATER FOLLOW-UP INSP Approved All areas stabilzed.
05/21/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to remove dirt ramp from street. Left message for Danny site super.
04/01/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor still needs to sweep street and clean up wash out.
03/24/2008 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to:
1- Clean all wash out around site.
2- Remove material from detention basin.
3- Install construction entrance.
4- Sweep Wieding Rd.
Spoke to Danny site super in regards to. If items not addressed I will issue stop work order.
11/15/2007 STORMWATER FOLLOW-UP INSP Not ready for Inspection Spoke to site super in regards to grades around site. Look low. Asked super to call for inspection once Magnum has installed A-B. Also contractor needs to start addressing SWPPP items in a timely manner.
11/01/2007 STORMWATER FOLLOW-UP INSP Partial Approval Need to clean up wash out.
10/22/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean up wash around site.
2- Stake down wattle southwest corner.
3- Repair construction entrance.
09/14/2007 STORMWATER FOLLOW-UP INSP Partial Approval Met with Danny on site. Went over re-fee, material dumped on site, the need to stabilize all areas disturbed by construction outside grading limits.
09/13/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to stake down wattle in west entrance to Valencia Rd. Clean up material dumped on site.
09/11/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued Notice of Violation. Contractor has 2 days to address:
1- Clean up all wash out on site.
2- Provide washout area per approved SWPPP plan.
3- Install controls in west entrance a long Valencia Rd.
Spoke to site super Danny, via cell phone at 1255 pm. Went over issues on the phone. If items are not address I will Stop Work Order.
08/14/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install construction entrance on southeast corner. (New entrance onto Valencia.)
07/27/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to control track out.
07/20/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Repair construction entrance.
2- Reinstall wattle on northside of project.
Spoke to site super in regards to. I explained to Matt with magnum once the basin is able to receive flows from storms the basin will need to be protected.