Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2011 | GRADING - FINAL | Continued | ||
| 03/16/2011 | GRADING - FINAL | Continued | NO ONE WORKING ON SITE AT THIS TIME. | |
| 10/31/2007 | GRADING - FINAL | Not Applicable | Spoke to Super in regards to extruded curb line. If contractor installs extruded curb 2.5' from face of sidewalk, wheel stops will not need to be installed. | |
| 10/11/2007 | GRADING - FINAL | Partial Approval | Met with contractor on site went over changes to scuppers and sidewalks. Contractor raised scupper inlet. | |
| 10/03/2007 | GRADING - FINAL | Correction Required | Met with Duane site super. looked over scupper installation. Contractor needs to install scuppers with 6" opening for inlet. Per Standard Detail 205. | |
| 08/08/2007 | GRADING - FINAL | Correction Required | Contractor forming up scuppers, contractor has not provided approved revised drawings. | |
| 06/13/2007 | GRADING - FINAL | Correction Required | Met on site with Hector (super) and Hillary (engineer) Discussed changes to approved drawings. I explained to Hillary and Hector that all changes to the drawings need to need to be approved by WillDan before final inspections. | |
| 05/22/2007 | GRADING - FINAL | Correction Required | Met with David on site went over changes to approved drawings. No one has contacted Willdan yet for approval to changes. | |
| 05/17/2007 | GRADING - FINAL | Correction Required | Contractor installed construction entrance. Contractor still needs to address correction notice issued on 4/23/07. | |
| 04/23/2007 | GRADING - FINAL | Correction Required | Met on site with Hector site super. Issued Correction Notice. Contractor needs to: 1- Clean all track out from site. 2- Clean all concrete wash out. 3- Install sidewalk scuppers, per approved plans. 4- Sidewalk not installed per DS. 5- Call in per con meeting. 6- Contractor needs to provide approved grading plan. 7- Provide scupper detail from engineer. 8- Have engineer provide crossection of north side of project (sidewalk). Non-compliance will result in a Stop Work Order. |
|
| 04/20/2007 | GRADING - FINAL | Correction Required | Contractor needs to sweep up track out. Clean up concrete wash out. Set up meeting with contractor for 0900, 4/23/07. Contractor placed concrete sidewalk on north side of project at wrong elev. and did not install scuppers. |