Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA PRE-GUNITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2006 | POOL/SPA PRE-GUNITE | Approved | IVRS - Inspection :* | |
| 12/20/2006 | POOL/SPA PRE-GUNITE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INCOMPLETE H20 PRESSURE TEST 2) GAS TEST PRESSURE INCOMPLETE 3) CLEANOUT ROCK AROUND ALL PLASTIC PIPING IF NEGATIVE EDGE-NEED ENGINEERING 4) STOPPED INSPECTION |