Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU02595
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/18/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
12/03/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | WORK STARTED ON NE CORNER OF SITE NO STORMWATER CONCERNS |
|
11/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ONE ON SITE NO CONCERNS |
|
10/16/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK CONTINUING NO STORMWATER CONCERNS AT THIS TIME |
|
09/29/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS DRIVEWAY CUTS ALONG 22ND ST ARE BEING MAINTAINED AND DO NOT APPEAR TO BE USED AT THIS TIME |
|
08/15/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT CLEANED UP AND ENTRANCE/EXIT IS NOT BEING USED | |
08/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TRACK OUT ONTO 22ND STREET TALKED TO MIKE WILHITE-ENTRANCE WAS CLOSED-WILL BE CLOSED AGAIN AND 22ND WILL BE SWEPT |
|
08/04/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONTROLS IN PLACE ALONG 22ND STREET | |
07/18/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS AT THIS TIME SITE IS MOSTLY STABLE AND NO CONSTRUCTION TRAFFIC APPEARS TO BE IMPACTING COT STORMDRAIN FACILITIES |
|
03/14/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | SMALL AGREGATE ROCK HAS BEEN PLACED AT SCE THIS AREA TO BE PAVED WITHIN A WEEK-THE SMALLER ROCK IS ACCEPTABLE AT THIS TIME |
|
03/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SCE IN PLACE TRACK OUT ONTO COLUMBUS BLVD |
|
02/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | MIKE NOT ON SITE CONCRETE WASHOUT NEEDS TO BE SIGNED AND BERMED |
|
12/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NEEDS TO SWEEP STREET AT SCE SCE NEEDS MAINTENANCE WALL AT PERIMETER IN LIEU OF CONTROLS |
|
11/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
10/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MIKE NO MAJOR CONCERNS ON GOING MAINTENANCE CONTINUING |
|
10/04/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL CONCERNS ADDRESSED FROM PREVIOUS INSPECTION | |
09/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS TO CORRECT OR RE-FEE CONCRETE WASHOUT NEEDS TO BE SIGNED CONTINUE WITH SWEEPING SCHEDULE (EVERY OTHER DAY-MANUAL) |