Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T06BU02595
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/18/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
09/12/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | WATTLE NOT STAKED AS REQUESTED 9/10 | |
09/10/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | Contractor installed controls on north side of project and around stockpile. Construction entrance installed. Contractor will need to sweep entry and Columbus as needed, Maintain waddle as needed, stake waddle that is in the dirt area, provide a copy of NOI. |
|
09/07/2007 | ENGINEERING PRE-CONSTRUCTION | Denied | NO PRECON CALLED CORRECTION NOTICE ISSUED HAS UNTIL 1:30 TO CORRECT -GRADING PLANS MUST BE ON SITE -SWPPP MUST BE ONSITE AND POSTED -SWPPP CONTROLS MUST BE INSTALLED PER PLAN ADDRESS: TRACK OUT LEAKING WATER HYDRANT CONSTRUCTION ENTRANCE |
|
09/07/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | MET WITH MIKE WILHITE, BOBBY D'ANGELO AND JIM FEMLING ONSITE SCE TO BE PLACED BY MONDAY AM NOI IS TO BE APPLIED FOR ONLINE AND POSTED SWPPP TO BE ON SITE WITH GRADING PLANS LEAKING WATER HYDRANT IS TO BE FIXED CONTROLS TO BE PLACED AT STOCKPILE PLAN IS TO BE PHASED FOR C OF O PURPOSES |