Inspection History Details
Permit: T06BU02533
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 12/21/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean Calle Santa Cruz. 2- Repair wattle around perimeter of project. 3- Provide usable wash out area. (clean over flow) 4- Mason needs to address wash out around mixer. 5- Clean all washout areas. Spoke to Mike project manager. |
|
| 10/25/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No SWPPP concerns at this time. |