Permit: T06BU02533

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/02/2008 STORMWATER FOLLOW-UP INSP Approved All areas stabilized.
12/21/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean Calle Santa Cruz.
2- Repair wattle around perimeter of project.
3- Provide usable wash out area. (clean over flow)
4- Mason needs to address wash out around mixer.
5- Clean all washout areas.
Spoke to Mike project manager.
10/25/2007 STORMWATER FOLLOW-UP INSP Partial Approval No SWPPP concerns at this time.