Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 11/20/2006 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
Contractor added wattle to SWPPP controls. |
| 11/14/2006 |
STORMWATER INSTALL OF CONTROLS |
|
Partial Approval |
Contractor to install wattle around perimeter of project. |