Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2008 | GRADING - FINAL | Approved | Owner completed punch list. | |
| 12/10/2007 | GRADING - FINAL | Denied | Contractor needs to: 1- Complete handrail. 2- Grade south side of pipes flat. 3- Provide letter from engineer in regards to Drainage Manual, chapter XIV, section 14.2 (7). 4- Remove all spoil material. 5- Clean street. |