Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/14/2007 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - MET WITH CONTRACTOR (JEFF - MARCON EXCAV 904-2446, ENGINEER- PAUL NZOMO 971-9511 AND DEVELOPER) ON SITE.
1) PROVIDE A STABILIZED CONSTRUCTION ENTRANCE PER SWPPP.
2) INSTALL SEDIMENT CONTROLS (BMP'S) AT THE PERIMETER OF YOUR GRADING LIMIT PER YOUR PLAN.
3) MAINTAIN ALL BMP'S THROUGHOUT CONSTRUCTION AS DESCRIBED IN YOUR SWPPP. BMP'S ARE REQUIRED UNTIL THE SITE IS 100% STABILIZED.
4) CALL FOR APPROVAL INSPECTION WHEN BMP'S HAVE BEEN INSTALLED.
5) SWEEP UP ALL TRACKED MATERIAL OFF OF SB ON A ROUTINE BASIS.
6) CONTAIN ALL CONSTRUCTION MATERIALS USED ON SITE AND DISPOSE OF PROPERLY.
7) POST A COPY OF YOUR NOI ON SITE.
8) STAY WITH-IN DESIGNATED GRADING LIMITS.
|
| 12/12/2007 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Cancelled |
Entered by MRUSSO1 - |