Permit: T06BU02449

Parcel: 10121014B

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Follow-up

Permit Number - T06BU02449

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Follow-up Not Ready
09/03/2013 SITE - Stormwater Follow-up DROBERTS Partial Approval Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CURRENTLY 7 LOTS UNDER CONSTRUCTION, 3 LOTS HAVE BEEN COMPLETED. ALL LOT UNDER CONSTRUCTION APPEAR TO MAINTAINING THEIR CONTROLS.
01/09/2009 SITE - Stormwater Follow-up MRUSSO Partial Approval Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/10/2008 SITE - Stormwater Follow-up MRUSSO Partial Approval Entered by MRUSSO1 - SPOKE WITH SUPERINTENDENT (JEFF), RECOMMENDED MAINT. ON SEDIMENT CONTROLS IN PLACE.
06/24/2008 SITE - Stormwater Follow-up MRUSSO Partial Approval Entered by MRUSSO1 - CONTRACTOR RE-INSTALLED SEDIEMNT CONTROLS ALONG THE PERIMETER OF THE PROJECT PER THE APPROVED SWPPP. PROVIDE REVISED PLAN SHOWING CHANGES MADE TO CULVERT PIPING USED FOR DRAINAGE.
06/12/2008 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by MRUSSO1 - STORM WATER CONTROLS NEED RE-INSTALLED PER PLAN PROVIDE SW SELF INSPECTIONS REQUIRED PER PLAN SITE IN NON-COMPLIANCE WITH SWPPP/AZPDES
04/08/2008 SITE - Stormwater Follow-up MRUSSO Partial Approval Entered by MRUSSO1 - CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF SB ROAD. NO OTHER STORM WATER CONCERNS AT THIS TIME.
03/20/2008 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by MRUSSO1 - 10 DAY COMPLIANCE - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AT ALL ENTRANCES/EXITS PER PLAN. 2) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL SITE IS PAVED. 3) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND SEDIMENT CONTROLS ARE MAINTAINED AS NEEDED. 4) ROUTINELY SWEEP UP TRACKED MATERIAL OFF OF SIVERBELL ROAD.