10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
09/03/2013 | SITE - Stormwater Follow-up | DROBERTS | Partial Approval | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CURRENTLY 7 LOTS UNDER CONSTRUCTION, 3 LOTS HAVE BEEN COMPLETED. ALL LOT UNDER CONSTRUCTION APPEAR TO MAINTAINING THEIR CONTROLS. |
01/09/2009 | SITE - Stormwater Follow-up | MRUSSO | Partial Approval | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/10/2008 | SITE - Stormwater Follow-up | MRUSSO | Partial Approval | Entered by MRUSSO1 - SPOKE WITH SUPERINTENDENT (JEFF), RECOMMENDED MAINT. ON SEDIMENT CONTROLS IN PLACE. |
06/24/2008 | SITE - Stormwater Follow-up | MRUSSO | Partial Approval | Entered by MRUSSO1 - CONTRACTOR RE-INSTALLED SEDIEMNT CONTROLS ALONG THE PERIMETER OF THE PROJECT PER THE APPROVED SWPPP. PROVIDE REVISED PLAN SHOWING CHANGES MADE TO CULVERT PIPING USED FOR DRAINAGE. |
06/12/2008 | SITE - Stormwater Follow-up | MRUSSO | Correction Required | Entered by MRUSSO1 - STORM WATER CONTROLS NEED RE-INSTALLED PER PLAN PROVIDE SW SELF INSPECTIONS REQUIRED PER PLAN SITE IN NON-COMPLIANCE WITH SWPPP/AZPDES |
04/08/2008 | SITE - Stormwater Follow-up | MRUSSO | Partial Approval | Entered by MRUSSO1 - CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF SB ROAD. NO OTHER STORM WATER CONCERNS AT THIS TIME. |
03/20/2008 | SITE - Stormwater Follow-up | MRUSSO | Correction Required | Entered by MRUSSO1 - 10 DAY COMPLIANCE - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AT ALL ENTRANCES/EXITS PER PLAN. 2) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL SITE IS PAVED. 3) ENSURE STORM WATER MAINTENANCE SELF INSPECTIONS ARE PERFORMED AND SEDIMENT CONTROLS ARE MAINTAINED AS NEEDED. 4) ROUTINELY SWEEP UP TRACKED MATERIAL OFF OF SIVERBELL ROAD. |