Inspection Status: Complete (Recurring)
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2013 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NEW CONTRACTOR ON SITE.
2) WORK IS BEING DONE TO BUILD HOMES ON INDIVIDUAL LOTS, EACH LOT HAS ITS OWN GRADING PERMIT.
3) THE OVERALL SITE GRADING/SITE CONSTRUCTION WAS NEVER COMPLETED.
4) DP13-0091 (LOT#2), DP13-0091 (LOT#?), T11BU01392 (LOT#5) |
| 01/29/2009 |
ENGR Engineering Final
|
MRUSSO |
Correction Required |
Entered by MRUSSO1 - PUNCHLIST ITEMS NOT COMPLETED, SITE NOT STABILIZED.
NO ACTIVITY ONSITE. |
| 01/12/2009 |
ENGR Engineering Final
|
MRUSSO |
Correction Required |
Entered by MRUSSO1 - NO RESPONSE TO INSPECTION RESULTS GENERATED 10/16/08. NO ACTIVITY ON SITE, NO CHANGES |
| 10/16/2008 |
ENGR Engineering Final
|
MRUSSO |
Denied |
Entered by MRUSSO1 - PRIOR TO FINAL GRADING APPROVAL, COMPLETE THE FOLLOWING:
WILDLIFE DRIVE
1) INSTALL TOE-DOWN AT END POINT OF DRAINAGE CHANNEL, SEE NOTE #12.
2) STABILIZE SIDE SLOPES OF ALL DRAINAGE WAYS PER PLAN - >3:1 SLOPES REQUIRE ROCK RIP RAP, AND < 3:1 REQUIRE HYDROSEED.
3) PAVE ALL DRIVEWAYS TO ALL LOTS AS SHOWN ON APPROVED PLANS SEE NOTE #2.
4) INSTALL CONCRETE HEADERS ALONG DRIVEWAY ACCESS TO LOT #23, SEE NOTE #10.
5) INSTALL HAND RAILING AT SCUPPER ALONG NORTH EAST SIDE.
6) INSTALL ACCESS GATES AND AND ROADWAY SIGNS PER PLAN.
7) REMOVE ALL TEMP SEDIMENT CONTROLS .
8) REMOVE STOCKPILED MATERIAL OR PERMANENTLY STABILIZE IT.
KILEY COURT -
1) INSTALL DRIVEWAYS TO LOTS AS SHOWN ON APPROVED PLAN.
2) REMOVE TEMP SEDIMENT CONTROLS.
3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL DRAINAGE WAYS HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS. |
| 06/12/2008 |
ENGR Engineering Final
|
MRUSSO |
Denied |
Entered by MRUSSO1 - ANY SIGNIFICANT CHANGES MADE TO THE ORIGINAL APPROVED GRADING PLAN MUST BE APPROVED BY THE EOR AND THE COT, AND PROVIDED FOR INSPECTION. |