Inspection History Details
Permit: T06BU02408
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 10/24/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SIDEWALKS HAVE BEEN POURED SHELLS APPEAR ALMOST COMPLETE CURBING INSTALLED NO CONCERNS AT THIS TIME |
|
| 10/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME CURB PLACED ON WEST SIDE OF SITE SIDEWALK BEING INSTALLED |
|
| 09/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 09/06/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS PAINTING OF BUILDINGS ONGOING |
|
| 07/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | no concerns at this time controls appear to be working | |
| 07/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME FOUNDATION WORK CONTINUES |
|
| 06/19/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 06/01/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 04/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | WASHOUT IN PLACE | |
| 04/16/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS -CONTAIN ALL CONCRETE, STUCCO, MORTAR AND PAINT WASHOUT IN A SIGNED DESIGNATED WASHOUT AREA |