Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2008 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
RECEIVED A COPY OF THE PRE-CON DOCUMENT |
| 10/24/2008 |
ENGINEERING PRE-CONSTRUCTION |
|
Partial Approval |
COMPLETE PRE-CON DOCUMENT, SCHEDULE A FOLLOW-UP INSPECTION AND PROVIDE A COPY OF THE COMPLETED PRE CON DOCUMENT TO THE INSPECTOR. |
| 10/23/2008 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
I OBSERVED CONSTRUCTION ACTIVITY AND STOPPED IN TO INVESTIGATE. NOTIFIED SITE SUPER THAT A PRE-CON INSPECTION MUST BE SCHEDULED. |