| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | REVIEWED AND SIGNED PRE-CON FORM | |
| 01/12/2009 | ENGINEERING PRE-CONSTRUCTION | Continued | CONTRACTOR HAS NOT COMPLETED PRE-CON REQUIREMENTS, HE WILL BE READY ON WED 1/14/09 | |
| 01/05/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1. READ, FILL IN THE BLANKS AND PROVIDE A COMPLETED COPY OF THE STORMWATER PRE-CONSTRUCTION MEETING FORM TO THE INSPECTOR. 2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE AND UPDATE THE SWPPP. 3. MAINTAIN STRAW WATTLE AND PROVIDE STAKES. 4. UPDATE SWPPP TO SHOW ALL REVISIONS. 5. COMPLETE BLANKS IN SWPPP BOOK APPENDICES. 6. CALL FOR RE-INSPECTION IN ONE WEEK,1/12/09. 7. CONSULT WITH ENGINEER AND ARCHITECT REGARDING C.O.T. APPROVED REVISED PLANS. SHOW SIDEWALK WIDTHS AND RELOCATION OF TRASH ENCLOSURE. |