Permit: T06BU02243

Parcel: 13409015G

Inspection Status: Correction Required

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
06/13/2007 STORMWATER INSTALL OF CONTROLS Correction Required VISTED SITE LEFT MESSAGE FOR BILL FETZER 548-1990

CALL RETURNED
HE IS NOT SURE WHAT ON SITE FLOW DECISION HAS BEEN MADE
NO SCE
NO DUMPSTER ON SITE
03/27/2007 STORMWATER INSTALL OF CONTROLS Correction Required THE MAJORITY OF THE SILT FENCE IS INSTALLED

CORRECTION REQUIRED
1. COMPLETE SILT FENCE INSTALLATION.
2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE.
3. CONSULT WITH THE ENGINEER REGARDING FLOW FROM UPSTREAM PROPERTIES.