Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 02/05/2007 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | 1. POST AZPDES 2. INSTALL SW CONTROLS 3. READ SWPPP AND PRE-CON FORM |
|
| 02/01/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | SITE CLEARING HAS OCCURRED OVER THE PAST (2) DAYS. SCOTT CARNES 247-7343 WILL CALL IN PRE-CON FOR MONDAY AND WILL PROVIDE PERMIT, PLANS AND SWPPP CONTROLS |
|
| 01/22/2007 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |