Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | GRADING - FINAL | Approved | All items on punch list completed. | |
| 03/09/2007 | GRADING - FINAL | Partial Approval | Contractor needs to: 1- Complete gate. 2- Install dumpster pad, per note 8. 3- Complete striping, per note 17. 4- Backfill south side of block screen wall. 5- Install sidewalk, per note 14. 6- Install post barricade. 7- Remove all debris from HC parking area. 8- Install protection for bleeder pipe. Spoke to Terry site super. |
|
| 02/26/2007 | GRADING - FINAL | Partial Approval | Contractor digging for basin. Contractor will pave near end of week. | |
| 11/15/2006 | GRADING - FINAL | Correction Required | Contractor working outside of grading limits. Contractor cleanred area on southside of Ganley Rd. This area is to be used as a staging area. Contractor needs to have area added to grading and SWPPP drawings and install SWPPP controls around. |