Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 02/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Terry site super and went over plan for stormwater controls around basin. Also what will be needed for final C of O. | |
| 02/07/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed items from last inspection. Contractor needs to add more stakes to wattle. | |
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Replace damaged wattle around site. 2- Re-install missing wattle. 3- Stop all work outside of grading limits. 4- Add wattle to south side storage areas. Around all distrubed areas. 5- Clean up wash out around site. 6- Repair concrete wash out area. (leaking) 7- Stabilize area next to entrance. South side of project building. Contractor has 7 days to make repairs. If repairs are not made a Stop Work Order will be issued. Spoke to Dave site super. |