Permit: T06BU01910
Inspection Status: Approved
Inspection History: LANDSCAPE INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2012 | LANDSCAPE INSPECTION | Approved | I HAVE LOOKED OVER THIS SITE AND LOOKED AT THE PLANS PROVIDED BY THE CONTRACTOR. IT APPEARS THAT THERE HAVE BEEN MINOR CHANGES TO THIS SITE THAT WILL NEED TO BE SHOWN ON THE AS-BUILT DRAWINGS AND APPROVED BY THE LANDSCAPE DEPARTMENT. | |
| 04/30/2012 | LANDSCAPE INSPECTION | Continued | THE SITE WAS LOOKED AT BUT THIS ITEM WAS NOT ABLE TO BE CHECKED SINCE THERE ARE NO LANDSCAPING PLANS PROVIDED DURING THIS INSPECTION. | |
| 06/18/2009 | LANDSCAPE INSPECTION | Denied | According to approved tentative plat Case # S04-180 the following items need to be addressed prior to landscape final approval: 1. On-site monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation shall be provided during project construction at the expense of the developer for all residential development that is over five (5) acres The monitoring shall be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in LUC 3.8.4. Monitoring report is required as to the disposition of preserved or transplanted protected native plants. 2. The area between the right-of-way line and sidewalk and the area between the sidewalk and the curb, if not covered with vegetation, shall be covered with an appropriate inorganic ground cover, such as decomposed granite LUC 3.7.2.4. |