Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T06BU01910
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/29/2012 | STORMWATER FOLLOW-UP INSP | Approved | ||
05/15/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME, NO ADDITIONAL WORK HAS BEEN PERFORMED AT THIS TIME. | |
04/30/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME, ALL STORMWATER CONTROLS NEED TO BE REMOVED PRIOR TO CLOSING THIS PERMIT OUT. | |
03/05/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | Minor track out from lots | |
10/27/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor continues to stabilize areas disturbed by construction. | |
07/25/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place. Need to address drainage fron northeast corner. | |
04/10/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor needs to address: 1- Replace/Repair wattle broken apart. 2- Clean concrete wash out around site. 3- Install controls (SWPPP) in basin inlet. Contractor has 7 days to address items. If items are not addressed I will issue a Stp Work Oder or Notice of Violation. Spoke to Bill with D.R. Horton via cell phone @ 1008 hours 4/10/08. |
|
04/10/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to provide washout and ensure use. Issued Correction Notice. | |
03/18/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Roadway 32' wide with 4' curb. Contractor needs to install controls in bleeder pipe. Also provide wash out area for sub-contractors. | |
12/12/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Spoke to Bill R. in regards to cleaning track out from site. | |
12/03/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed correction notice. | |
11/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to: 1- Install or replace all controls not in working order. 2- Provide SWPPP for inspections. Contractor needs to address items in 5 days. If items are not address, I will issue a Notice of Violation or Stop Work Order. Called Bill Reynolds in regards to. Bill did not answer and left message at 954-3237, approx 0922, 11/14/07. Also sent correction through cert mail. |
|
10/23/2007 | STORMWATER FOLLOW-UP INSP | Not Applicable | Met on site with Bill and sub-contractor United Site Services, Explained what I want to see for installation of SWPPP controls. (follow approved details) | |
10/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Spoke to Bill with D.R. Horton, will met with Bill and new SWPPP contractor on site 10/23/07. Contractor needs to keep all SWPPP controls in working order. | |
10/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Make repairs to silt fence. 2- Install wattle along Drexel Rd. 3- Sweep Drexel Rd. Called and left message with Bill. Bill did not return call. |
|
09/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Install controls around stock pile. 2- Install controls in drainage channel. Contractor installing sewer line along Drexel. No controls installed. |
|
09/04/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Spoke to Bill in regards to: 1- Location of SWPPP not on site. 2- Need to install controls around stock pile. 3- Silt fence needs to be repaired. Bill said his SWPPP contractor was going to be there on 9/5/07 and would address items. |
|
08/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Repair silt fence. 2- Re-install construction entrance. 3- Contractor needs to keep a copy of the SWPPP on site durning all hours of construction. |
|
08/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor made repaired silt fence. | |
08/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor repaired silt fencing. | |
08/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to address: 1- Repair/Replace silt fencing. Also install per approved plan. Spoke to super with O'Leary and left message with Bill R. with D.R. Horton. Bill R. never returned my call. If item is not addressed I will issue a stop work order. |