Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2008 | GRADING - FINAL | Approved | Contractor addressed punch list. Contractor still needs to provide engineers cert. for Detention/Retention basin and drainage, will hold on permit T06CM05078. | |
| 04/28/2008 | GRADING - FINAL | Denied | Contractor needs to complete all work. Provide letter from engineer per C.O.T. Drainage mainaul. Have all revisions to drawing approved at 201 North Stone. Address sidewalk slope, no more then 5% per ADA. Complete all basin work and stabilie all areas disturbed by construction. THIS IS NOT A COMPLETE LIST. | |
| 04/24/2008 | GRADING - FINAL | Not ready for Inspection | COMPLETE ALL SITE WORK COMPLETE ALL CLEAN UP ADDRESS PUNCHLIST ITEMS FROM 4/23 INSPECTION T06CM05078 MUST HAVE BASIN CERTIFICATION MARC IS REGULAR INSPECTOR 240-9871 The following items must be complete prior to Temp C of O. 1) The sidewalk on north side of building outside of vehicle access door is not constructed per plan and mey require truncated domes. 2) Complete stormwater basin per the approved plans, and submit an engineering certification. 3) Repair drain pipe outlet in basin from loading dock. 4) Provide drop pins for dumpster gates to hold in open position. 5) Install pedestrian access from ROW to building as shown on the approved plans. 6) Install bicycle parking as shown on the approved plans. 7) Renew grading permit and call for final inspection. 8) Clean up site and remove all construction debris. |
|
| 04/10/2007 | GRADING - FINAL | Not ready for Inspection | No activity at this time. |