Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/22/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SITE HAS BEEN PAVED ONLY LANDSCAPING LEFT TO COMPLETE. | |
| 03/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP UP TRACKED MATERIAL OFF OF ALL PUBLIC ROADWAYS. PAVING IN PROGRESS, STORM WATER WILL BE FINALED WHEN SITE IS STABILIZED. |
|
| 02/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-INSTALL SEDIMENT CONTROLS IN AREAS THAT HAVEN'T BEEN STABILIZED. 2) SWEEP UP TRACKED MATERIAL OFFF OF PUBLIC ROADS. 3) PROVIDE A CONCRETE WASH OUT. 4) RE-ESTABLISH ROCK ENTRANCE. |
|
| 01/25/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 12/21/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) MAINTAIN SEDIMENT CONTROLS ALONG THE PERIMETER ON A ROUTINE BASIS - SOME SILT FENCE DOWN. 2) CLEAN OUT CONCRETE WASH OUT WHEN FULL AND DISPOSE OF PROPERLY. 3) PERFORM AND DOCUMENT STORM WATER MAINT. INSPECTIONS PER PLAN. 4) RE- ESTABLISH ROCK ENTRANCES AND SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. |
|
| 11/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
| 11/21/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | REPAIR/MAINTAIN SEDIMENT CONTROLS AT SITE. SWEEP UP TRACKED MATERIAL OFF OF ROADWAYS ON A ROUTINE BASIS. |
|
| 11/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |