Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | STOP WORK PULLED, SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP. 1) MAINTAIN CONTROLS PER SWPPP 2) SWEEP UP TRACKED MATERIAL ROUTINELY. 3) INSTALL A DESIGNATED CONCRETE WASH OUT PER PLAN. |
|
| 10/24/2006 | ENGINEERING PRE-CONSTRUCTION | Violation | STOP WORK ISSUED, NO STORM WATER CONTROLS INSTALLED, CONSTRUCTION HAS STARTED. CALLED CONTRACTOR (CHESNUT CONSTR.). HAVE APPROVED SWPPP. |