Permit: T06BU01659

Parcel: 140410530

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
05/22/2008 STORMWATER FOLLOW-UP INSP Approved All areas stabilized.
11/16/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Tony site super in regards to installing controls around stockpile material in right-of-way or removing. Contractor using lot on south side of project. Needs to add it to SWPPP.
10/17/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to:
1- Pick up trash from around site.
2- Repair construction entrance.
3- Keep stucco wash out cleaned up.
Spoke to site super in regards to.
08/24/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor addressed issues from correction notice.
08/21/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor has 7 days to address:
1- Clean wash out around site.
2- Provide wash out area for sub-contractors.
3- Repair construction entrance.
4- Make repairs to silt fence north side of project.
If contractor does not address will issue notice of violation. Spoke to Tony site super in regards to issues.
07/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
06/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor will have equipment on site next week. Contractor will clean up wash out and install new washout pit.
05/11/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean wash out area and re-install. Clean all wash out from around site. Ensure all subs use wash out area.
2- Sweep Universal Ave.
Super not on site. Left inspection sheet on supers chair.
04/19/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to install wash out area.
03/19/2007 STORMWATER FOLLOW-UP INSP Partial Approval Controls in place. Contractor needs to sweep east entrance, track out.
02/22/2007 STORMWATER FOLLOW-UP INSP Partial Approval Spoke to site super in regards to basin side slopes. Not graded per approved plans.