Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T06BU01651
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2008 | GRADING - FINAL | Approved | Please see notes on engineering inspection. T07CM03406. | |
03/31/2008 | GRADING - FINAL | Not ready for Inspection | Met with Randall on site. Contractor cutting south basin wall to 4 to 1 slope. I explained anything less then 4 to 1 will need a safety barrier . | |
03/28/2008 | GRADING - FINAL | Correction Required | Issued correction notice. Contractor needs to: 1- Install rip rap on south basin side slope (steeper then 3 to 1) 2- Have engineer address the need for safety barrier, south side of basin. Spoke to Randal in regards to. |
|
03/21/2008 | GRADING - FINAL | Partial Approval | Met on site with Randal, contractor completed paving told. I told Randal to call in final when Basin work is complete. | |
03/06/2008 | GRADING - FINAL | Partial Approval | Contractor formed up catch basin #2. Per COT detail. | |
03/05/2008 | GRADING - FINAL | Partial Approval | Contractor installed pipe from lift station to right-of-way, installed per detail. Contractor needs to get electric and plumbing inspections completed for lift station. Contractor provided asbuilt elev. for inspection on 2/29/08 Start manhole #1 44.01 Middle manhole #2 in - 43.01 out - 42.91 Basin manhole #3 41.60 |
|
02/29/2008 | GRADING - FINAL | Partial Approval | Contractor installing stormwater sewer per approved details. Contractor still needs to provide me elev. for pipe. | |
01/31/2008 | GRADING - FINAL | Correction Required | All work at risk until contractor can provide approved copy of revised plan. Contractor needs to schedule stormwater pre-con. |