Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06BU01610

Parcel: 14108002H

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
07/17/2007 STORMWATER FOLLOW-UP INSP Approved
05/02/2007 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS ALMOST COMPLETELY STABLE
THERE IS A CHANGE THAT NEEDS TO BE PUT ON REVISED GRADING PLAN AND APPROVED THROUGH COT-CHANGE IN FLOODPLAIN LIMIT AND RIP RAP ON A SLOPE NE CORNER OF SITE
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval SITE STABILIZATION HAS STARTED
01/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval DRIVEWAYS HAVE BEEN POURED
SITE WORK CONTINUES
DISTURBED AREAS STILL NEED TO BE STABILIZIED
12/12/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
EXTEND STABILIZED CONSTRUCTION ENTRANCES
SWEEP TRACK OUT BOTH SIDES OF PROJECT
11/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval AZPDES POSTING HAS BEEN MOVED
SITE COULD USE TO BE SWEPT
08/30/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-PORTA TOILET TIPPED OVER
-NO CONCRETE WASH OUT ON SITE-MUST BE PLACED AND SIGNED