Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2006 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 08/16/2006 | STORMWATER INSTALL OF CONTROLS | Correction Required | MET WITH SUPERINTENDENT ON SITE ( JERRY HENDRIX) FROM LANG WYATT CONSTRUCTION, DISCUSSED THE APPROVED STORM WATER POLLUTION PREVENTION PLAN. 1) SWPPP AND GRADING PLAN ON SITE. 2) NOI IS ON SITE; HOWEVER A SIGNED COPY OF THE NOI MUST BE POSTED AT THE ENTRANCE TO THE SITE. 3) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN, MAY NEED TO ADD SUPPLEMENTAL CONTROLS WHERE WATER CHANNELIZED (NW) CORNER. 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE PER PLAN. 5) PROVIDE A DESIGNATED CONCRETE WASH OUT. 6) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 7) SWEEP UP TRACKED MATERIAL AS NEEDED. |