Inspection History Details
Permit: T06BU01511
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2006 | STORMWATER INSTALL OF CONTROLS | Approved | 1) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. 2) PROVIDE A DESIGNATED CONCRETE/MATERIAL WASH OUT AS SOON AS PRACTICABLE. 3) DOCUMENT ANY CHANGES MADE TO THE APPROVED STORM WATER PLAN, AND PROVIDE TO THE INSPECTOR. 4) PERFORM PERIODIC STORM WATER MAINT. INSPECTIONS PER PLAN, AND DOCUMENT THEM. 5) SWEEP UP ALL TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. 6) I WILL ADDRESS BANK/SLOPE EROSION LOCATED ON THE NW SIDE OF SITE - WILL FOLLOW UP. |
|
| 11/13/2006 | STORMWATER INSTALL OF CONTROLS | Partial Approval | Contractor needs to: 1- Install all controls per detail. (holes under wattle, wattle placed ontop of bush) 2- Controls installed in concrete channel on south west corner unacceptable. |