Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA PLUMBING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2006 | POOL/SPA PLUMBING | Approved | ||
| 08/14/2006 | POOL/SPA PLUMBING | Partial Approval | IVRS - Inspection :* 1) INSURE VACUUM LINE IS OPEN AT FINAL 2) CONDUIT TO LIGHT AND BOND WIRES OK 3) NO SVRS REQUIRED-ENGINEERD SYSTEM |